Proposition Safety/Renovation

The bond issue will fund upgrades, repairs, replacements, installations, and improvements to the District’s existing facilities including, but not limited to:
Potosi Elementary School

  • Complete entrance security modifications to increase safety.
  • Enclose rider line walkway to increase safety.
  • Install anti-intruder safety film on windows.
  • Install new and additional camera systems.
  • Repair roofs.
  • Pave and repair asphalt parking lots.
  • Remove asbestos.
  • Purchase Chromebooks to aid student learning.
  • Install a new sound system.
  • Install overhangs.
Trojan Intermediate School

  • Complete entrance security modifications to increase safety.
  • Install anti-intruder safety film on windows.
  • Install new and additional camera systems.
  • Repair roofs.
  • Pave and repair asphalt parking lots.
  • Construct a concrete front bus lane.
  • Correct drainage issues.
  • Purchase Chromebooks to aid student learning.
  • Install a new sound system.
  • Install overhangs.
John Evans Middle School

  • Complete entrance security modifications to increase safety and Americans with Disability Act (ADA) compliance.
  • Enclose walkway to increase safety.
  • Install anti-intruder safety film on windows.
  • Install new and additional camera systems.
  • Repair roofs.
  • Pave and repair asphalt parking lots.
  • Equip gymnasium with air conditioning.
  • Remove asbestos.
  • Purchase Chromebooks to aid student learning.
  • Install a new sound system.
Potosi High School

  • Complete entrance security modifications to increase safety.
  • Install anti-intruder safety film on windows.
  • Install new and additional camera systems.
  • Repair roofs.
  • Pave and repair asphalt parking lots.
  • Remove asbestos.
  • Purchase Chromebooks to aid student learning.
District-Wide

  • Install GPS/Radio systems in all buses.
  • Install 3-camera systems in all remaining older buses.
  • Equip all buses with stop sign cameras.
  • Construct additions for ADA compliance at the Central Office.

 

 
Some of the aging Infrastructure to be addressed with the Bond Issue.

Frequently Asked Questions